Hydraulics or air, what pressure to hold and what equipment to attract. Practical review of the strength and leak tests.
Before the piping or pressure receptacle is introduced, it shall be checked for strength and leak. They do it in two ways. — by liquid or gas, — and each has its own scope and safety.
The system is filled with water and pressure raised above the working unit. Water is practically uncompressable, so when it's destroyed, energy is released minimally. — It's the safest method. Applyed where it is permissible to fill and then remove the liquid.
When water cannot be filled (e.g. dry gas lines), air or nitrogen shall be used. The gas is compressed and stored in energy, so pneumatic testing tests require strict compliance with safety zones, ramp pressure and certified equipment. Often, a bouter is used to create high pressure.
Pneumatic tests are more dangerous than hydraulics because of the stored energy of compressed gas. They are conducted in a programme, with fences and ramped load. This is a job for a trained crew.
pressure testing, pneumatic testing testing and blowing up of nitrogen with equipment and crew — Please leave the application.